钻孔灌注桩后压浆技术是一种新兴的桩基施工技术,利用高压劈裂灌浆原理,在灌注桩浇制完成后,通过预埋的后压浆管路对钻孔灌注桩桩端及桩侧压注水泥浆液,使桩端的沉渣隐患及时得到根除,持力层得以固结密实,从而大大提高桩周摩阻力或桩端的承载力。钻孔灌注桩后压浆自实施至今,已被实践证明是一项具有创造性、新颖性和实用性的新概念桩基施工技术,是有效提高单桩承载力的新型施工方法。
Bored post-grouting technology is a new pile foundation construction technology, the use of high-pressure splitting grouting principle, pouring piles in the pouring is completed, through the post-grouting pipe embedded bored pile tip and Side pile grouting cement slurry, so that the pile end of the hidden dangers of sediments in time to be eradicated, bearing layer consolidation density, thereby greatly improving the pile friction resistance or pile end bearing capacity. Post-grouting bored piles since the implementation since it has been proved to be a creative, novelty and practicality of the new concept of pile construction technology, is to effectively improve the bearing capacity of a new type of construction method.