交通部机辆组于七一年五月份组织了第一、二、三铁路设计院,第四铁路工程局等单位组成“车辆段专用设备设计会战组”。会战组根据交通部机辆组于七○年组织各路局(段)、设计院组成的车辆段专用设备精简配套调查组提出的配套项目,到广州、柳州、贵阳、上海、徐州、济南、锦州、北京、沈阳等局所属各段调查,按照部机辆组提出的“贯彻土洋并举”等原则,与现场工
In May 2007, the Transport Department of the Ministry of Communications organized the first, second and third railway design institutes and the Fourth Railway Engineering Bureau to form a “special equipment design battle group for the depot.” The battle group was set up according to the supporting projects put forward by the survey team of the special vehicle depot set up by the various bureaux (sections) and design institutes organized by the Ministry of Communications of the Vehicle Departments in 1970. The teams went to Guangzhou, Liuzhou, Guiyang, Shanghai, Xuzhou, Jinan, Jinzhou, Beijing, Shenyang and other sections belonging to the investigation, in accordance with the Ministry of Machine Building put forward the “implementation of the principle of simultaneous development of both the land” and the site workers