摘要:伴随着我国社会经济以及科学技术的发展,我国高层建筑施工技术得到了质的提高,并取得了举世瞩目的成就。高层建筑施工有着技术复杂且影响范围广,针对高层建筑施工的特征及现状,本文分别从高层建筑施工技术的要点,深基础施工、逆向施工、预制模板、钢结构施工、泵送混凝土及混凝土强度控制等方面并结合青海地区地质特点进行了阐述,从而增强了高层建筑施工的有效性与实效性。
关键词:高层建筑;施工技术;建筑特征;现状分析
Abstract: Along with our country social economy as well as the development of science and technology, our country high building construction technology has been improved in quality, gained the success that attract worldwide attention. Construction of high-rise building with complicated technology and the impact of a wide range of high-rise building construction, aiming at the characteristic and the present situation, this article from the high-rise building construction technology key points, deep foundation construction, reverse construction, prefabricated formwork, steel structure construction, pumping concrete and concrete strength control and so on and integrated with the Qinghai regional geological features are introduced, thereby enhancing the high-rise building construction validity and effectiveness.
Key words: high-rise building; construction technology; construction; present situation analysis
中图分类号:TU7 文献标识码:A文章编号:
随着我国市场经济的不断发展以及不断加快的城镇化建设,尤其像我们青海属于西部地区,成为城镇化的先锋,高层建筑也越来越成为社会的趋势,但同时其所带来的问题也引起了人们越来越广泛地关注。在当前的经济形势下,加强高层建筑施工有着极其重要的经济价值。一方面,它可以有效缓解城市用地紧张问题; 另一方面,它也是提高人们生活质量的有效措施。然而,目前我国高层建筑施工中各种管理制度还不尽完善,还存在着诸多急需解决的问题。
一、高层建筑简介
高层建筑主要是指建筑本身的高度或层数超过一定的范围,这类建筑均被称之为高层建筑。高层建筑的起点高度或层数,各国规定不一,且多无绝对、严格的标准。中国自2005年起规定超过10层的住宅建筑和超过24米高的其他民用建筑为高层建筑。10层及10层以上的居住建筑,(包括首层设置商业服务网点的住宅)或建筑高度超过24m(不包含单层主体建筑超过24m的体育馆、会堂、剧院等)的公共建筑。实践证明,高层建筑可以带来明显的社会经济效益:首先,使人口集中,可利用建筑内部的竖向和横向交通缩短部门之间的联系距离,从而提高效率;其次能使大面积建筑的用地大幅度缩小,有可能在城市中心地段选址尤其像我们青海地区土地资源较匮乏,使其成了必要性;第三,可以减少市政建设投资和缩短建筑工期。
二、高层建筑施工技术特点
1、工程量大,施工布置难度大。由于高层建筑的工程量大,分项工程项目较多,从而需要多个单位、多个工种相互协调,总承包与分包涉及多个单位和部门需要紧密的协作关系。与此同时要尽量压缩临设工程,减少现场材料、设备、制品储存量,要按施工进度安排分阶段的进行施工现场布置,节约施工用地。
2、空中作业高度大,垂直运输量大,安全隐患多。 由于高层建筑楼高层多,从而使得垂直运输工作量相对较大。对垂直运输设备的高度、运量、安全可靠性都提出了新的要求,施工过程中应注意该环节的安全问题,避免引起不必要的安全事故。此外防火、用水、用电、通信、临时厕所等在低层、多层施工中较易解决的问题,在高层,特别是在超高层施工中往往难度较大。
3、基础开挖深度大,支护结构费用高。由于高层建筑本身体量较大、高度较高,故此其整体稳定性至关重要。一般高層建筑基础随着高度增高而加深,城市施工又无条件放坡开挖,因此支护结构工程量大。
4、建筑工期长,恶劣气候的季节性施工措施不可避免。据不完全统计,普通的高层建筑施工周期大约需要2年左右的时间方可完成。而在整个施工过程中,主体结构及装饰的施工周期是最长的,务必制定行之有效的施工措施来缩短施工周期。
5、高层施工新技术、新工艺多在高层施工中由于建筑本身的复杂性和现代化,新的技术、工艺、设备的采用对施工技术人员、工人都提出了新的要求。
6、高层建筑施工对周边环境影响大高层建筑大部分都建在城市,而城区存在着建筑密集、高层深基坑开挖深度大等状况,同时又由于施工期往往要大量抽取地下水,易导致周边建筑、市政设施沉降变形,甚至开裂破坏。因此施工期施工单位必须加强沉降监测及对周边生态环境的保护的问题。
7、影响高层施工因素多,对施工要求相对较高。在大部分的高层建筑施工中, 主要结构材料是现浇钢筋混凝土,这就需要对钢筋连接、模板加工、结构安全以及高性能混凝土等施工技术有较高要求。同时,建筑消防、装饰、防水等要求也相对较高,这些都对施工技术提出了更高的要求。
三、高层建筑施工技术
1、深基础施工技术
根据青海地区的实际情况,高层建筑的基础结合当地地质特点,采取多种途径,是基础保持牢固可靠。而高层建筑由于其工程量较大,需要的承载力也大,而同时如果当地地基土质较复杂,持力层较深,而地下室埋置深度并不大,则采用桩基础是必要的。当基础埋置特别深时,在施工技术上困难大,并且不易保证施工的安全,宜采用沉井或沉箱法施工。
2、预制模板技术
模板是新浇混凝土成型用的模具,要求他能保证结构和构件的形状、尺寸的准确。鉴于结构施工重复性高的特点以及竖向结构施工的优点,我们采用滑模法与爬模法来有效控制施工工期,并提高主体结构的整体性能。两者有着一定的相似之处,这种相似性主要体现在: 首先,它们的结构整体性好,机械化程度高;其次,它们对施工工期与施工成本的控制都有着极为迫切的需求。在施工过程中,我们可以采用预制模板技术,将滑模法与爬模法付诸实践,以实现缩短施工工期与降低施工成本的目的。
3、现浇混凝土技术
现浇混凝土技术是高层建筑施工技术的重要组成部分。混凝土不仅数量大而且抗压强度高,高层建筑对混凝土的配比提出了较高的要求。目前国内的大多施工方采用化学外加剂技术,以满足泵送混凝土技术的需求。在这项技术的作用下,混凝土的泵送高度也有了很大程度的提高,这有效地提高了高层建筑的施工效率,同时,也保证了混凝土的强度,使其达到了较好的使用效果。
4、钢结构施工技术
在现阶段高层建筑尤其是超高层建筑施工中,钢结构施工技术应用较为广泛,这得益于钢结构施工具有钢结构自身强度高、施工速度快与工业化强度高的特性。高层建筑钢结构包括诸以下施工类型例如大跨度空间钢结构、钢和混凝土组合结构、高层重型钢结构等等。
5、高层建筑裂缝控制技术
(1)设计措施
裂缝控制应该从源头着手,从设计着手是第一步:
a.设置永久性伸缩缝;外墙面适当位置留分隔缝等防止相关原因产生的裂缝。
b.重视对构造钢筋的配置,以避免结构断面突变带来的应力集中,对采用混凝土小型空心砌块等轻质墙体,增设构造柱;加强预留的门窗洞口采用钢筋混凝土框;合理设置屋面保温层与隔气层等。
c.在合理位置设置后浇带。
(2)施工措施
在混凝土裂缝预防中,施工阶段对新浇混凝土的早期养护非常重要。而对于大体积混凝土,应着重在控制砼的温升,延缓砼的降温速率,减少砼的收缩,提高砼的极限拉伸值,改善约束和完善构造设计等方面采取措施。
四、结束语
随着经济以及城镇高层建筑业的迅速发展,我国在高层建筑施工技术方面得到了极大地提高。然而,随着施工规模以及建筑结构日趋复杂,高层建筑施工技术随之要进行不断地革新与改善。就目前而言,结合青海省特殊的地质特点,我们应当依据施工中的技术要点而选择合理的优化方案。具体而言,首先,要对高层建筑施工的特征有一个清晰地认识,要依据高层建筑逐層施工的特点,压缩施工作业时间以及空闲时间,使施工各工序间的无缝衔接;其次,要依据高层建筑垂直纵向发展以及相对工作作业面窄与施工进度短的特点,进一步施工效率;最后,要依据高层建筑作业环境差的特点,不断提高优化结构施工工艺,增强建筑施工的安全性与稳定性。总之,我们要坚持一切从实际出发的原则,将施工实践与施工需求有机地结合起来,充分运用已有相关经验和先进的科学技术,从而不断提升我国高层建筑施工的技术水平。
参考文献:
[1]张一杭.怎样预防高层建筑施工裂缝的措施.电大理工,2009.
[2]社旭杭.高层建筑施工要点初探.中国新技术新产品,2009.
[3]何登前.对高层建筑施工技术的探讨.四川建材,2009.
[4]张立芳.高层建筑技术层的设计和利用工程设计.2009.
关键词:高层建筑;施工技术;建筑特征;现状分析
Abstract: Along with our country social economy as well as the development of science and technology, our country high building construction technology has been improved in quality, gained the success that attract worldwide attention. Construction of high-rise building with complicated technology and the impact of a wide range of high-rise building construction, aiming at the characteristic and the present situation, this article from the high-rise building construction technology key points, deep foundation construction, reverse construction, prefabricated formwork, steel structure construction, pumping concrete and concrete strength control and so on and integrated with the Qinghai regional geological features are introduced, thereby enhancing the high-rise building construction validity and effectiveness.
Key words: high-rise building; construction technology; construction; present situation analysis
中图分类号:TU7 文献标识码:A文章编号:
随着我国市场经济的不断发展以及不断加快的城镇化建设,尤其像我们青海属于西部地区,成为城镇化的先锋,高层建筑也越来越成为社会的趋势,但同时其所带来的问题也引起了人们越来越广泛地关注。在当前的经济形势下,加强高层建筑施工有着极其重要的经济价值。一方面,它可以有效缓解城市用地紧张问题; 另一方面,它也是提高人们生活质量的有效措施。然而,目前我国高层建筑施工中各种管理制度还不尽完善,还存在着诸多急需解决的问题。
一、高层建筑简介
高层建筑主要是指建筑本身的高度或层数超过一定的范围,这类建筑均被称之为高层建筑。高层建筑的起点高度或层数,各国规定不一,且多无绝对、严格的标准。中国自2005年起规定超过10层的住宅建筑和超过24米高的其他民用建筑为高层建筑。10层及10层以上的居住建筑,(包括首层设置商业服务网点的住宅)或建筑高度超过24m(不包含单层主体建筑超过24m的体育馆、会堂、剧院等)的公共建筑。实践证明,高层建筑可以带来明显的社会经济效益:首先,使人口集中,可利用建筑内部的竖向和横向交通缩短部门之间的联系距离,从而提高效率;其次能使大面积建筑的用地大幅度缩小,有可能在城市中心地段选址尤其像我们青海地区土地资源较匮乏,使其成了必要性;第三,可以减少市政建设投资和缩短建筑工期。
二、高层建筑施工技术特点
1、工程量大,施工布置难度大。由于高层建筑的工程量大,分项工程项目较多,从而需要多个单位、多个工种相互协调,总承包与分包涉及多个单位和部门需要紧密的协作关系。与此同时要尽量压缩临设工程,减少现场材料、设备、制品储存量,要按施工进度安排分阶段的进行施工现场布置,节约施工用地。
2、空中作业高度大,垂直运输量大,安全隐患多。 由于高层建筑楼高层多,从而使得垂直运输工作量相对较大。对垂直运输设备的高度、运量、安全可靠性都提出了新的要求,施工过程中应注意该环节的安全问题,避免引起不必要的安全事故。此外防火、用水、用电、通信、临时厕所等在低层、多层施工中较易解决的问题,在高层,特别是在超高层施工中往往难度较大。
3、基础开挖深度大,支护结构费用高。由于高层建筑本身体量较大、高度较高,故此其整体稳定性至关重要。一般高層建筑基础随着高度增高而加深,城市施工又无条件放坡开挖,因此支护结构工程量大。
4、建筑工期长,恶劣气候的季节性施工措施不可避免。据不完全统计,普通的高层建筑施工周期大约需要2年左右的时间方可完成。而在整个施工过程中,主体结构及装饰的施工周期是最长的,务必制定行之有效的施工措施来缩短施工周期。
5、高层施工新技术、新工艺多在高层施工中由于建筑本身的复杂性和现代化,新的技术、工艺、设备的采用对施工技术人员、工人都提出了新的要求。
6、高层建筑施工对周边环境影响大高层建筑大部分都建在城市,而城区存在着建筑密集、高层深基坑开挖深度大等状况,同时又由于施工期往往要大量抽取地下水,易导致周边建筑、市政设施沉降变形,甚至开裂破坏。因此施工期施工单位必须加强沉降监测及对周边生态环境的保护的问题。
7、影响高层施工因素多,对施工要求相对较高。在大部分的高层建筑施工中, 主要结构材料是现浇钢筋混凝土,这就需要对钢筋连接、模板加工、结构安全以及高性能混凝土等施工技术有较高要求。同时,建筑消防、装饰、防水等要求也相对较高,这些都对施工技术提出了更高的要求。
三、高层建筑施工技术
1、深基础施工技术
根据青海地区的实际情况,高层建筑的基础结合当地地质特点,采取多种途径,是基础保持牢固可靠。而高层建筑由于其工程量较大,需要的承载力也大,而同时如果当地地基土质较复杂,持力层较深,而地下室埋置深度并不大,则采用桩基础是必要的。当基础埋置特别深时,在施工技术上困难大,并且不易保证施工的安全,宜采用沉井或沉箱法施工。
2、预制模板技术
模板是新浇混凝土成型用的模具,要求他能保证结构和构件的形状、尺寸的准确。鉴于结构施工重复性高的特点以及竖向结构施工的优点,我们采用滑模法与爬模法来有效控制施工工期,并提高主体结构的整体性能。两者有着一定的相似之处,这种相似性主要体现在: 首先,它们的结构整体性好,机械化程度高;其次,它们对施工工期与施工成本的控制都有着极为迫切的需求。在施工过程中,我们可以采用预制模板技术,将滑模法与爬模法付诸实践,以实现缩短施工工期与降低施工成本的目的。
3、现浇混凝土技术
现浇混凝土技术是高层建筑施工技术的重要组成部分。混凝土不仅数量大而且抗压强度高,高层建筑对混凝土的配比提出了较高的要求。目前国内的大多施工方采用化学外加剂技术,以满足泵送混凝土技术的需求。在这项技术的作用下,混凝土的泵送高度也有了很大程度的提高,这有效地提高了高层建筑的施工效率,同时,也保证了混凝土的强度,使其达到了较好的使用效果。
4、钢结构施工技术
在现阶段高层建筑尤其是超高层建筑施工中,钢结构施工技术应用较为广泛,这得益于钢结构施工具有钢结构自身强度高、施工速度快与工业化强度高的特性。高层建筑钢结构包括诸以下施工类型例如大跨度空间钢结构、钢和混凝土组合结构、高层重型钢结构等等。
5、高层建筑裂缝控制技术
(1)设计措施
裂缝控制应该从源头着手,从设计着手是第一步:
a.设置永久性伸缩缝;外墙面适当位置留分隔缝等防止相关原因产生的裂缝。
b.重视对构造钢筋的配置,以避免结构断面突变带来的应力集中,对采用混凝土小型空心砌块等轻质墙体,增设构造柱;加强预留的门窗洞口采用钢筋混凝土框;合理设置屋面保温层与隔气层等。
c.在合理位置设置后浇带。
(2)施工措施
在混凝土裂缝预防中,施工阶段对新浇混凝土的早期养护非常重要。而对于大体积混凝土,应着重在控制砼的温升,延缓砼的降温速率,减少砼的收缩,提高砼的极限拉伸值,改善约束和完善构造设计等方面采取措施。
四、结束语
随着经济以及城镇高层建筑业的迅速发展,我国在高层建筑施工技术方面得到了极大地提高。然而,随着施工规模以及建筑结构日趋复杂,高层建筑施工技术随之要进行不断地革新与改善。就目前而言,结合青海省特殊的地质特点,我们应当依据施工中的技术要点而选择合理的优化方案。具体而言,首先,要对高层建筑施工的特征有一个清晰地认识,要依据高层建筑逐層施工的特点,压缩施工作业时间以及空闲时间,使施工各工序间的无缝衔接;其次,要依据高层建筑垂直纵向发展以及相对工作作业面窄与施工进度短的特点,进一步施工效率;最后,要依据高层建筑作业环境差的特点,不断提高优化结构施工工艺,增强建筑施工的安全性与稳定性。总之,我们要坚持一切从实际出发的原则,将施工实践与施工需求有机地结合起来,充分运用已有相关经验和先进的科学技术,从而不断提升我国高层建筑施工的技术水平。