论文部分内容阅读
为了搞好机电排灌的建设与管理工作,根据专员、市长会议讨论,现决定从一九六五年起把有关机电排灌工程建设工作统一移交给水利部门办理,具体分工如下:(一)凡属新建、改建、配套(包括渠道配套、机电配套)机电排灌工程和机电井的规划、计划、设计、施工和已投入生产的机电灌站的灌溉技术指导等工作统一由水利部门负责。(二)凡属已投入生产运行的机电灌站的经营管理工作(包括生产用水及机电管理、成本核算、水费征收、灌区建筑物的岁修养护、粽合加工、修理车间)、机电灌站和水井提水
In order to improve the construction and management of mechanical and electrical drainage and irrigation, according to the discussion of commissioners and mayors’ meetings, it is hereby decided that the construction of the mechanical and electrical drainage and irrigation works should be handed over to the water conservancy department for handling from 1965 onwards. The specific division of labor is as follows: The planning, planning, design and construction of electromechanical drainage and irrigation works and electromechanical wells for new construction and reconstruction (including channel matching and mechanical and electrical matching) as well as irrigation technical guidance for mechanical and electrical filling stations that have been put into production are all under the responsibility of the department of water conservancy. (2) The operation and management of mechanical and electrical filling stations that have been put into operation (including production water and electromechanical management, costing, collection of water fees, annual maintenance of irrigation buildings, dumplings processing and repair workshops), mechanical and electric filling stations And water wells