无碴轨道基础工程变形控制的关键施工技术

来源 :石家庄铁道学院学报 | 被引量 : 0次 | 上传用户:czronick
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
保持客运专线无碴轨道持续稳定的高平顺性,是高速运行的列车对无碴轨道基础工程最基本的技术要求。以无碴轨道基础工程(路基、桥梁和隧道)沉降或变形控制为切入点,从施工的角度分析客运专线无碴轨道基础工程技术特点,提出关键的施工技术对策,并对需要进一步研究和解决的施工技术问题进行探讨。 Maintaining sustained and stable high ridership of ballastless track on passenger dedicated lines is the most basic technical requirement for ballastless track foundation engineering for high-speed trains. Taking the settlement or deformation control of ballastless track foundation engineering (subgrade, bridge and tunnel) as the starting point, this paper analyzes the technical features of ballastless track foundation engineering of passenger dedicated line from construction point of view, puts forward key construction technology countermeasures, and further studies and solutions are needed Construction technology issues to be explored.
其他文献
结合广州地铁四号线高架试验段工程,介绍了下承式节段拼装架桥机的结构特点与架梁工艺.
介绍了渝怀线武隆隧道穿越重庆市汇邦制药厂厂区段的施工措施,对复杂条件下的隧道施工方案进行了研究,对类似工程具有借鉴意义。
跃进渠大桥为衡德公路第5合同段内的一座大桥,全长171.22 m.上部为20.55 m+5×25 m+20.55 m单箱双室预应力连续箱梁,主要以跃进渠大桥箱梁为例介绍后张法预应力混凝土连
阐述了钢铁混凝土结构耐久性研究的现状;从开裂理论、有限元计算和修复等方面论述了对裂缝问题的研究,指出了特种混凝土抗裂性能的研究现状。
论述了生态建筑设计的影响因素,探讨了生态建筑的设计需要,因地制宜的处理建筑与自然环境和人文环境的关系,因地制宜的选用生态建筑技术和生态材料.
详细论述了跨海大桥钻孔桩施工过程中常发生的各种事故,分析了其发生的原因,并探讨了预防事故发生的措施,对保证钻孔灌注桩的顺利施工提供了保证.
对静载作用下的高强钢筋混凝土梁进行试验研究,提出了平均裂缝间距以及裂缝宽度计算公式的改进建议.同时,首次把广义协调矩形单元GQ12用于高强钢筋混凝土梁非线性有限元分析,
阐述了以Sybase SQL Anywhere5.5为后台数据库管理、以Powerbuilder7.0为前台应用开发工具的专科接本科教育管理系统的设计与实现方案,该系统包括专接本报名系统、专接本审核
吊钟岩特大桥为一座转体法施工的大跨度铁路拱桥,重点介绍转体施工技术、施工控制模型的建立、应力位移监控方法,可为同类型桥梁施工提供参考。
主要介绍太行山隧道进口浅埋围岩段开挖与支护技术,新技术、新工艺、新机具、新材料“四新”技术在该围岩段的应用,以及通过监控量测对围岩开挖支护参数进行调整和修正,优化施工