论文部分内容阅读
利国铁矿“七五”规划内容是多方面的,现只就其矿山开采这一核心问题进行分析,并以经济评价的结论来探讨发展徐州冶金工业的资源对策。 1.利国铁矿开采规划概述 1.1现有采区贮量:利国铁矿采区有磨山、西马山和峒历三个矿井。至1986年初,共结存铁矿石地质贮量1323万吨,矿石质量好,平均含铁50~51%,并共生有铜、金、银、钻等可利用的元素。 1.2现有采区生产能力:三个矿井现有设计能力43万吨/年。“七五”期间,磨山、
The “Seventh Five-Year Plan” of Liuguo Iron Mine is multifaceted in content. Only the core issue of its mining is analyzed and the resource strategy of developing Xuzhou Metallurgical Industry is discussed based on the conclusion of economic evaluation. 1. Overview of Liuguo Iron Mine Mining Planning 1.1 Reserves of existing mining areas: There are three mines in the ore mined area of Liuguo Iron Mine, West Mashan and Qiongli. By the beginning of 1986, a total of 13.23 million tons of iron ore deposits were stored, with good ore quality and an average iron content of 50-51%. Symbiotic elements such as copper, gold, silver and diamond were available. 1.2 existing mining area production capacity: the existing design capacity of the three mines 430,000 tons / year. During the “Seventh Five-Year” period, mills,