广东省新兴县合河水库电站扩建第一期工程由珠委设计院承担施工设计,工程于1993年初动工,1995年7月竣工,1号机(3200kW)并网发电,运行情况良好。合河水库位于新兴江的主流竹勒河上游,原来是以灌溉为主的水利工程。70年代续建电站装3台卧式机组(3×800kW),限于当时条件,机组的效率低、耗水量大。根据新兴县电力发展的需要,决定新建一
The first phase of the Hehe Reservoir Hydropower Station Expansion project in Xinxing County, Guangdong Province, was undertaken by the Design Institute of Zhuhai Committee. The project was started in early 1993 and completed in July 1995. Unit 1 (3200kW) was connected to the grid and was operating in good condition. Hehe Reservoir is located in the upper reaches of Zhule River, the mainstream of Xinxing River, which used to be an irrigation-based water conservancy project. In the 1970s, 3 horizontal units (3 × 800 kW) were installed in the power station, which were limited to the conditions at that time. The unit was inefficient and had a large water consumption. Xinxing County, according to the needs of power development, decided to build a new one