论文部分内容阅读
首钢炼钢厂于1964年投产,有3座30t纯氧顶吹转炉,设计能力为60万吨。随着生产发展,结合我国实际情况,无论在时间上还是在空间上都需要充分挖潜利用,这就要求我们必须掌握全面的准确的原始数据作为技术分析的依据,才能科学地确定相应措施,以不断提高炼钢生产能力。为此,我厂十分重视计量检测的管理。根据我们可能投入的资金,不断扩大和更新检测装置,进而应用单板机监视转炉的操作,并相应建立一套管理制度。运用承包制把责任具体化,落实到各级管理人员和生产岗位,进行系统管理,强化了企业管理这一基础工
Shougang Steel Works put into operation in 1964, there are three 30t pure oxygen top blown converter, design capacity of 600,000 tons. With the development of production and the actual situation in our country, both in time and in space need to be fully exploited and exploited. This requires that we must have comprehensive and accurate raw data as the basis for technical analysis in order to scientifically determine the corresponding measures Constantly improve the steelmaking capacity. To this end, I plant attaches great importance to the measurement and testing management. Based on the funds we may invest, we will continue to expand and upgrade the testing equipment to monitor the operation of the converter using a single-chip microcomputer and establish a management system accordingly. The use of contract system to the specific responsibility to implement all levels of management and production positions, system management, and strengthen the foundation of enterprise management