针对平煤股份十二矿允许可采建筑物下存在较大量压煤的问题,并为了实现矿井平稳发展、控制地表下沉和减小瓦斯治理难度,提出了采用固体充填物充填采空区,采出建筑物下压煤的开采模式,通过充填工艺实践,解决了充填物进入采空区、相关工艺及参数等问题,在保证地面建筑物完好的情况下,能有效采出平煤股份十二矿允许可采建筑物下压煤463万t以上,并为解放平煤股份“三下”压煤摸索出一种行之有效的工艺。
In view of the fact that Pingdingshan No.12 Mine allows a large amount of coal to be pressed under recoverable structures and in order to achieve the smooth development of the mine, control the surface subsidence and reduce the difficulty of gas treatment, a new method of filling the goaf with solid filling is proposed. Mining coal mining under the mining model, through the filling process practice, to solve the fill into the goaf, the relevant process and parameters and other issues, to ensure that the ground buildings in good condition, can effectively Pingdingshan shares ten Second Mine allows mining of buildings under the pressure of more than 4.63 million tons of coal, and for the liberation of Pingdingshan “three” plow to work out an effective process.