国华宁海电厂二期工程2×1000MW机组在2009年实现双机投产后,象山港内火力发电工程装机容量达到6800MW,年耗煤量达到1700万吨,煤炭供应任务相当繁重,压力越来越大。本文从象山港3.5万吨级航道工程的通过能力论证及结合神华运贸一体化优势下船舶运力计划调运管理经验等方面,探析象山港3.5万吨级航道工程如何实现对百万装机火力发电厂近2000万吨的供煤保障。
Guohua Ninghai Power Plant Phase II 2 × 1000MW unit in 2009 to achieve dual production, Xiangshan Port thermal power generation project installed capacity reached 6800MW, the annual coal consumption reached 17 million tons, the task of coal supply is rather heavy, the pressure is more and more big . This article from Xiangshan Port 35000-ton waterway project through the ability to demonstrate and combine the advantages of integration of Shenhua Yun-han shipping capacity planning and transportation management experience and other aspects of Xiangshan Port 35,000-ton waterway project how to achieve a million installed thermal power plant Nearly 20 million tons of coal for security.