八十年代后期,为满足经济发展的需要,国家制定了集资办电的相关政策,促使我省电力建设速度大大加快,电力工业的改革和发展也取得了较大成就。1997年底,全省装机容量达1110.74万千瓦,我省长达30年的缺电局面得到缓解。随着二滩电站、宝珠寺电站、广安火电厂、成都电厂技改工程等项目的建成投产,预计到2000年全省装机容量将达1620万千瓦,电力市场已日趋形成低消费水平下的平衡和有效需求不
In the late 1980s, in order to meet the needs of economic development, the state formulated related policies for fund-raising offices, which accelerated the speed of power construction in our province and made great achievements in the reform and development of the power industry. At the end of 1997, the province’s installed capacity reached 11,107,400 kilowatts. The province’s power shortage for 30 years has been eased. With the completion and production of projects such as Ertan Power Station, Baozhusi Hydropower Station, Guang’an Thermal Power Plant, and Chengdu Power Plant, it is expected that the installed capacity of the province will reach 16.2 million kilowatts by the year 2000. The electricity market has gradually become balanced at low consumption levels. And effective demand is not