响洪甸水电站左坝头 F2 断层对坝肩稳定不利 ,为防止断层恶化 ,减少绕坝渗漏 ,采取了灌浆等方案进行处理
The F2 fault of the left dam of Xianghongdian Hydropower Station is unfavorable to the stability of the abutment. In order to prevent the deterioration of the fault and reduce the seepage around the dam, a grouting solution is adopted