近年来,我国的高层建筑越来越多,这就提高了建筑施工的难度,为了保证工程项目的安全实施,需要通过钢管式脚手架建立高支模结构,保护工程结构的稳定性,并为下一阶段的施工建立安全环境。但是高支模具有组装技术高、难度大和危险性高的特点,需要在施工的全过程中对质量进行检测控制,避免人员伤亡事故的发生。下面针对高支模的施工技术要点进行了具体的分析。
In recent years, more and more high-rise buildings in our country have increased the difficulty of building construction. In order to ensure the safe implementation of the project, it is necessary to establish the high-support structure through the steel-pipe scaffold to protect the stability of the engineering structure. A phase of construction to establish a safe environment. However, the high-branch mold has the characteristics of high assembly technology, high difficulty and high danger, and requires testing and control of the quality during the entire construction process to prevent the occurrence of casualty accidents. The following for the construction of high-mode mold technical points for a specific analysis.