我厂一号炉原为10吨/时风力机械抛煤机手摇炉排锅炉,由于不能烧劣质煤及操作劳动强度大,自一九七○年改为链式沸腾炉(半沸腾炉)后,出力有所提高,操作劳动强度减轻了,但也带来煤耗高、维护难等一些问题。针对这些问题,为了更进一步保证安全、满发,又能掺烧煤渣,节约好煤以及综合利用,我们结合本地本厂情况,分析各类炉型性能,决定又将它改革为溢流式沸腾炉(全沸腾炉)。在党的十大精神鼓舞下,改炉工作从一九七三年七月开始设计加工,九月底改装完毕,
Since the No.1 furnace of our plant was originally a 10 t / h wind turbine, the manual grate boilers can not burn inferior coal and the labor intensity of operation has been changed from 1970 to the chain boiling furnace (semi-boiling furnace) The output has been increased, the labor intensity of operation has been reduced, but some problems such as high coal consumption and difficulty in maintenance have also been brought about. In response to these problems, in order to further ensure safety, full of fat, but also mixed with cinder, save coal and comprehensive utilization, we combine the local factory conditions, analysis of various types of furnace performance, decided to reform it into an overflow boiling furnace (Full boiling furnace). Inspired by the ten major spirits of the party, the furnace reform was started from design and processing in July 1973 and completed at the end of September.