G.M.什鲁姆电站是加拿大最大的水力发电站之一,其3号机组发生了重大事故,不列颠哥伦比亚水电局的目标是尽快修复事故机组并使其重新尽早投入运行。使用创新的修复方法,在14个月内修复完该机组并使其恢复生产。在装机容量为2 730 MW的电站成功修复机组,是北美水电市场技术创新和实践经验的范例。
G.M. The Shrews Power Station is one of the largest hydropower stations in Canada with major incidents involving Unit 3, and the British Columbia Department of Water and Power aims to remediate the incidents as soon as possible and bring it back into operation as soon as possible. Rebuild the unit and bring it back to production within 14 months using an innovative repair method. The successful repair of a unit at a plant with an installed capacity of 2 730 MW is an example of technical innovation and practical experience in the North American hydropower market.