论文部分内容阅读
1 概况我们公司是为马钢职工建设住宅的自营施工企业,目前拥有固定资产原值763.19万元,其中设备固定资产464.74万元,141台数。为适应马钢公司设备维修管理体制向点检定修体制转变,改变过去主要施工机械“分散管理、无偿占用”的局面,同时为解决在小型现代机具大量涌入时丢失、损坏现象时有发生的困难。所以从1986年开始试行对设备实行有偿使用,试用经济手段来管理设备,这样一来取得了良好的效果,降低了成本,提高了设备完好率、利用率,从而对挖掘设备潜力,集中调配使用、统一组织
1 Overview Our company is a self-operated construction company that builds residential buildings for Masteel employees. It currently has a fixed asset value of 7.6319 million yuan, of which fixed equipment assets are 4,647,400 yuan and 141 units. In order to adapt to the transformation of the Masteel company’s equipment maintenance management system to the spot inspection and repair system, it has changed the situation of “decentralized management and free occupation” of major construction machinery in the past, and at the same time it has been resolved to solve the phenomenon of loss and damage in the influx of small modern machinery. difficult. Therefore, from 1986 onwards, trial implementation of paid use of equipment and trials of economical means to manage equipment have resulted in good results, reduced costs, improved equipment availability and utilization, and thus tapped the potential of equipment and concentrated deployment. Unified organization