In order to improve the recovery rate of coal, some mines have begun to recover the residual protective pillars in the form of short wall faces. However, it is difficult to control stability of the haulage entry and the ventilating entry under the mining influences of the pillar face and the two side faces. Thus the 4311 face, which was designed to recover the 57 m wide residual protective pillar in Guojiashan Coal Mine,was taken as engineering background. Distribution law of stress and plastic zone in the residual protective pillar was analyzed using the numerical simulation. Then the gob-side entry driving technology was proposed to layout the entries for the pillar face. Based on the analysis of stress distribution and deformation characteristics of surrounding rocks in gob-side entry driving with different width of narrow pillars, the width of the narrow pillar of the entries in the 4311 face was decided to be 4 m. In order to control stability of the gob-side entry driving, the mechanical model of the main roof was established and deformation characteristic of surrounding rock was analyzed. Then the bolt support technology with high strength and high pre-tightening force was proposed for entry support. Especially, the hydraulic expansion bolts were used to support the narrow pillar rib. The engineering results show that the width of the narrow pillar is reasonable and the entry support technology is effective. The research achievement can provide some references to pillar recovery for other coal mines. In order to improve the recovery rate of coal, some mines have begun to recover the residual protective pillars in the form of short wall faces. However, it is difficult to control stability of the haulage entry and the ventilating entry under the mining influences of the Thus the 4311 face, which was designed to recover the 57 m wide residual protection pillar in Guojiashan Coal Mine, was taken as engineering background. Distribution law of stress and plastic zone in the residual protective pillar using the numerical simulation. Then the gob-side entry driving technology was proposed to layout the entries for the pillar face. Based on the analysis of stress distribution and deformation characteristics of surrounding rocks in gob-side entry driving with different width of narrow pillars, the width of the narrow pillar of the entries in the 4311 face was decided to be 4 m. In order to control stability of the gob-side entry driving, the me Then the bolt support technology with high strength and high pre-tightening force was proposed for entry support. Especially, the hydraulic expansion bolts were used to support the narrow pillar The engineering results show that the width of the narrow pillar is reasonable and the entry support technology is effective. The research achievement can provide some pillar to pillar recovery for other coal mines.
其他文献
1概述rn安徽皖维高新材料股份有限公司水泥二期新建生产线采用干磨干烧工艺,掺入15%电石渣配料生产水泥,于2004年初投入工业运行.通过一年多时间的生产运行表明,其实际生产能
MDI热岛中心是为化工装置提供蒸汽热负荷的能源中心,选用循环流化床锅炉燃用高硫劣质煤,同步建设烟气脱硫装置,厂用辅机用电负荷量大,机组台数多,厂用电接线方式复杂、厂用电
这是一支闪耀着科技之光的团队。从1990年至今他们累计获得“中国土木工程詹天佑奖”4项、“华夏建设科学技术奖”1项、国家级发明专利5项、国家级工法4项、北京市工法6项、
期刊
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation
期刊
期刊
世间并不缺少美,只是缺少发现美的眼睛。发现美的眼睛只能独自欣赏,而建筑装饰设计师却可以把美传递给更多的人,可以让更多的人感知美、享受美。北京建工装饰集团设计师团队便是
在机械日常工作中,时常会出现各种故障,导致故障的原因有很多,例如机械故障、电气故障等,在液压设备中,由于油液处于流动状态,在系统中不易被观察,因此一旦发生故障,很难找到