新冠采选厂的尾矿,经由6级接力泵站输送至尾矿坝(每站有520瓩电机驱动的12P—7砂泵三台,常用两台,总扬程约280米,管线全长约5公里)。
The tailings of the new crown mining and dressing plant are transported to the tailings dam via a 6-stage relay pumping station (520 瓩 per motorized 12P-7 sand pump three, two commonly used, a total lift of about 280 meters, 5 km).