某厂初轧车间系1960年开始施工,1962年正式交付使用。在使用后,整个车间沉降严重,特别是主电室部分的地基不均匀沉降更为突出,以致吊车滑轨,严重地影响正常的生产作业,虽几经对吊车轨道作调整垫高,但由于沉降过程持续较长,沉降稳定较慢,吊车滑轨仍不能得以根本解决。为此,调整轨道的工作不得不一再进行,累计的局部的高差值达300mm (指相对而言)。这样,吊车上部的净空受到较大的缩减,严重影响吊车的正常作业和运行。近年,沉降已趋稳定。因此,为了保证吊车运行作业所必需的空间,对此作了较为彻底的处理。
The start-up workshop of a factory started construction in 1960 and was officially delivered in 1962. After use, the entire workshop is heavily settled, especially the uneven settlement of the foundation of the main power room is more prominent, resulting in crane slides, seriously affecting the normal production operations. Although the height of the crane track is adjusted for several times, due to settlement The process lasted for a long time, the settlement was slow and the crane slides could not be solved. For this reason, the work of adjusting the track had to be carried out repeatedly, with a cumulative local height difference of 300 mm (relatively speaking). In this way, the clearance of the upper part of the crane is greatly reduced, which seriously affects the normal operation and operation of the crane. In recent years, settlement has stabilized. Therefore, in order to ensure the necessary space for the operation of the crane, a more thorough treatment has been made.