论文部分内容阅读
本文在概述预应力管桩的基础上,主要对某工程施工的预应力管桩部分不合格的原因从设计和施工角度进行了探讨,旨在为避免今后出现类似问题提供一些经验教训。
Based on the overview of prestressed pipe piles, the paper mainly discusses the reasons for the unqualified prestressed pipe piles in some projects from the perspective of design and construction, and aims to provide some lessons to avoid similar problems in the future.