论文部分内容阅读
一、案情 申诉人中国××公司和被诉人××国××公司于1987年5月4日签订了买卖300T高压聚乙烯的82RJ80-947CK号合同(以下简称947合同),又于同年8月17日是签订了买卖1000T低密度聚乙烯的82RJ80-961CK合同(以下简称961合同).916合同项下的货物,于1987年10月29日抵目的港天津港后,按照合同的商品检验条款,由天津进出口商品检验局进行检验,并于1988年1月22日发出检验证书。检验证书写明:经过逐个拆组检查,共有764袋破损,破损货计重
I. Case Complainant ×× Company and the defendant ×× State × × Company signed the contract No. 82RJ80-947CK (hereinafter referred to as 947 Contract) for trading 300T high-pressure polyethylene on May 4, 1987, and in the same year 8 Contract No. 82RJ80-961CK (hereinafter referred to as “Contract 961”) was signed on the 17th of January. The goods under Contract No. 916 arrived at port of destination Tianjin Port on October 29, 1987 and were subject to the commodity inspection of the contract The terms of inspection by the Tianjin Import and Export Commodity Inspection Bureau, and in January 22, 1988 issued a test certificate. Inspection certificate states: After one by one disassembly inspection, a total of 764 bags damaged, damaged goods weight