成都电业系統职工,认真貫彻“預防为主”的方針,从去年冬季进入高峰負荷以来,有计划地对机、炉和輸、配电綫路設备进行了全面檢查維护,为1962年安全发供电提早做好准备。在成都电业局党委领导下,我們从檢查一年来发供电情况入手,总結經驗,揭发問題,制訂对策。并在此基础上进一步消除不安全因素。成都供电所带电作业队,在“提早动手,消灭雷害事故,保証安全供电”口号下,以不停电作业,在一万伏和三万五千伏輸配电线路上进行避雷器、木間隙安装,用絕緣支拉杆操作方法,增添綫路瓷瓶,不仅提前完成了1962年春季防雷工程,还保証了十一万伏超高压輸电线路正常供电。为了提高新工人技术水平,供电所办了变电站防雷、絕緣和防雷設备安装訓练班,使他們更好地掌握防雷設备安装技术,了解
The employees of Chengdu Electric System seriously implemented the principle of “prevention first”. Since entering the peak load in winter last year, a comprehensive inspection and maintenance of machines, furnaces, and transmission and distribution line equipment was carried out in a planned manner. It was 1962. Efforts should be made to prepare for the safe delivery of power. Under the leadership of the Party Committee of the Chengdu Electric Power Bureau, we started by examining the situation of power supply in the past year, summed up experience, exposed problems, and formulated countermeasures. And on this basis, further eliminate insecurity. The live working team of the Chengdu Power Supply Station under the slogan of “starting hands early, eradicating lightning accidents and ensuring safe power supply”, conducted uninterrupted operation, installed arresters and wooden gaps on the 10,000-volt and 35,000-volt power transmission and distribution lines. With the method of insulating bracing rods, the addition of circuit porcelain bottles not only completed the lightning protection project in the spring of 1962 in advance, but also ensured normal power supply to the 110,000 volt EHV transmission line. In order to improve the technical level of new workers, the power supply institute has provided submarine lightning protection, insulation and lightning protection equipment installation training classes so that they can better understand the installation technology of lightning protection equipment and understand