论文部分内容阅读
四号基础工程,是某轧钢厂的心脏。其施工特点是:工程量大,结构复杂,技术要求高,工期紧迫。我们在建设公司党委和公司党委的正确领导下,在各兄弟单位的大力支援下,借了我公司一工地三号基础首创样板的东风,采取集中兵力打歼灭战的办法,扎扎实实地开展了学三号、超三号的创样板群众运动。经过全体职工的大力奋战,终于夺取了胜利,在几个主要指标上超过了三号。在质量上,钢筋绑扎平直、准确、不错、不漏;埋设件安装中心线、标高精确,表面平整;模板安装不漏浆、不变形、平直、尺寸准;混凝土内实外光,棱角方正,标高正确,经竣工丈量,全部符合设计要求。交付机装后,经过设备安
No. 4 foundation project is the heart of a rolling mill. Its construction features are: large quantities of work, complex structures, high technical requirements, and tight schedules. Under the correct leadership of the Party Committee of the Construction Company and the party committee of the company, under the strong support of all brothers and units, we borrowed the Dongfeng of the company’s first designation on the site of the No. 3 foundation of our company to adopt a method of concentrating troops to fight annihilation, and carried out solid learning. No. 3 and No. 3 in the creation of the mass movement. After all the hard work of the entire staff, they finally won the victory and surpassed number three in several major indicators. In terms of quality, the steel bar bundles are straight, accurate, good and leak-proof; the center line and elevation of the buried parts are accurate, and the surface is flat; the template installation is free of slurry, no deformation, straightness, and accurate size; the concrete inside and outside light, edges and corners Founder, the correct elevation, completed measurement, all meet the design requirements. After the equipment is delivered, it is passed through the equipment.