论文部分内容阅读
PLC控制系统的设计以及施工阶段,应充分考虑各方面的干扰源,采取各种有效地措施,减小减弱干扰,使PLC系统正常运行。
PLC control system design and construction phase, should take full account of all sources of interference, to take all kinds of effective measures to reduce the interference to reduce the PLC system to normal operation.