论文部分内容阅读
根据红雁池第二发电有限责任公司在系统中的位置和重要性,论述了3号、4号机组电气系统纳入DCS的必要性和可行性,提出了本工程电气系统纳入DCS的内容。
According to the position and importance of Hongyanchi No.2 Power Generation Co., Ltd. In the system, the necessity and feasibility of integrating the electric system of No.3 and No.4 units into DCS were discussed. The content of incorporating the electric system of this project into DCS was put forward.