国家能源局最新数据显示,2014年度中国风电并网容量为9581万千瓦,新增并网容量1865万千瓦。2014年底出台的《能源发展战略行动计划(2014-2020年)》指出,大力发展风电,力争到2020年,风电装机达到2亿千瓦。风电在我国整个电源结构中的比例日益增长,已经连续两年超过核电,成为我国第三大电源。然而,与风电发展趋势相悖的却是,风电行业遭遇“弃风限电”(wind curtailment)的尴尬。弃风限电是指风机处于正
The latest data from the National Energy Administration show that in 2014, the wind power grid capacity in China was 95.81 million kilowatts, with a new grid-connected capacity of 18.65 million kilowatts. The “Energy Development Strategy Action Plan (2014-2020)” issued at the end of 2014 pointed out that to develop wind power energetically, and strive to 2020, wind power installed capacity reached 200 million kilowatts. The proportion of wind power in the entire power supply structure in our country is increasing day by day, surpassing nuclear power for two consecutive years and becoming the third largest power source in our country. However, contrary to the trend of wind power development, the wind power industry has encountered the embarrassment of “wind curtailment.” Abandoned wind power is the fan is at a positive