论文部分内容阅读
辽宁省观音阁水库位于太子河中上游 ,是一座以防洪、灌溉、城市生产、生活供水为主 ,结合养鱼、旅游、发电等具有综合经济效益的大型水库 .观音阁水库电站为坝后式电站 ,初步设计为 3台6 50 0 k W机组 ,为了充分利用水资源 ,增加电站的经济效益 ,故增设了 1台 12 50 k W水轮发电机组 .但由于水库利水调节方式的改变 ,12 50 k W机组已不能按设计要求安全稳定地运行发电 ,所以在 1997年4月开始对该机组进行了改造 ,并于 1997年 5月 16日使其重新投入运行发电 .通过 1年多的运行观察 ,效果是好的 ,既增加了电站的经济效益 ,又能充分利用水资源 ,达到了改造的目的 .
Guanyinge Reservoir in Liaoning Province is located in the middle and upper reaches of the Taizi River and is a large-scale reservoir with integrated economic benefits such as flood control, irrigation, urban production and living water supply, combined with fish farming, tourism and power generation. The Guanyinge Reservoir Hydropower Station is a dam- , Initially designed as three 6 50 0 kW units, in order to make full use of water resources and increase the economic benefits of the power station, an additional 12 50 kW hydroelectric generator set was added, but due to the change of reservoir water regulation mode, 12 50 Unit kW was no longer able to operate safely and stably as designed, so the unit was retrofitted in April 1997 and brought back into operation on May 16, 1997. With more than one year of operational observations , The effect is good, both to increase the economic benefits of power plants, but also make full use of water resources, to achieve the purpose of transformation.