论文部分内容阅读
介绍了龙滩水电站右岸308.5 m高程混凝土生产系统2×6 m3拌和楼IHI搅拌机液压站改造情况,对改造原因、改造方案的实施以及改造后取得的效果进行了阐述。
The reconstruction of hydraulic station of IHI mixer at 2 × 6 m3 mixing plant with 308.5 m elevation concrete production system on the right bank of Longtan Hydropower Station was introduced. The reasons for the reform, the implementation of the reform program and the results obtained after the reform were described.