论文部分内容阅读
阐述了应设置机械排烟的场所、建筑排烟口的面积计算及设置要求。提出了排烟口施工中应注意的一些细节、注意事项。确保建筑防排烟系统从设计计算到施工应用,能达到规范的具体要求,以便在建筑投入使用中,一旦发生火灾能发挥良好的作用,最大限度降低火灾的风险,保证人员安全疏散,减少人员伤亡。
The places where mechanical smoke exhaust should be set up and the area calculation and setting requirements of building exhaust vents are described. Put forward the exhaust port construction should pay attention to some of the details, precautions. To ensure that the building smoke control system from design calculations to construction applications, to meet the specific requirements of the code in order to put into use in the construction, in case of fire can play a good role in minimizing the risk of fire, to ensure the safety evacuation of personnel and reduce staff casualties.