为合理开发利用金沙江水能资源,促进“西电东送”和西部大开发,加快民族地区经济社会发展,2012年2月10日,国家发改委以发改能源[2012]384号文对金沙江鲁地拉水电站项目核准进行了批复,同意建设鲁地拉水电站。鲁地拉水电站由中国华电集团、金沙江中游水电开发有限公司、云南省投资控股集团有限公司分别按75%、17%和8%的比例出资建设和管理。鲁地拉水电站安装6台36万kW混流式水轮机组,总装机容量216万kW,年均发电量
In order to rationally develop and utilize the Jinsha River hydropower resources, promote “West to East” and the western development and speed up the economic and social development in ethnic regions, on February 10, 2012, the National Development and Reform Commission took the document of Development and Reform [2012] No. 384 Jinsha River Rudula Hydropower Station project approval was approved, agreed to build Ludila hydropower station. The Rudila Hydropower Station is funded and constructed by China Huadian Corporation, Jinsha River Midstream Hydropower Development Co., Ltd. and Yunnan Investment Holding Group Co., Ltd. with 75%, 17% and 8% respectively. Ludira Hydropower Station installed six 360000 kW Francis turbine units with a total installed capacity of 2160000 kW, the average annual generating capacity