论文部分内容阅读
施工阶段作为EPC模式的核心环节,是建设项目实体最终形成的重要阶段,其造价管理更是创优质工程中的重中之重。因此,本文基于集成管理理论,首先深入挖掘并整合了有色金属建设项目施工阶段造价管理面临的现实问题,然后从全要素集成管理和全方位集成管理两个方面提出了造价管理对策,以期完善造价管理体系。
The construction phase, as the core link of the EPC model, is an important stage in the final formation of a construction project entity. Its cost management is also the most important task in creating a quality project. Therefore, based on the theory of integrated management, this dissertation digs and integrates the practical problems of cost management in the construction phase of non-ferrous metal construction project. Then it puts forward the cost management measures from two aspects of total factor integrated management and omni-directional integrated management in order to improve the cost Management system.