论文部分内容阅读
华能澜沧江水电股份有限公司小湾水电厂(简称小湾水电厂)是一座拥有着世界最高双曲拱坝的水电站,在建设过程中攻克了诸多世界性难题。小湾水电工程是国家实施西部大开发及“西电东送”战略的标志性工程,是澜沧江中下游河段的龙头电站。小湾水电厂装设有6台单机容量70万kW混流式机组,总装机容量420万kW,年保证发电量190亿kW·h,总库容150亿m~3,以发电为主,兼有防洪、
Huaneng Lancang River Hydropower Co., Ltd. Xiaowan Hydropower Plant (Xiaowan Hydropower Plant) is a hydropower station with the world’s highest double curvature arch dam, which has overcome many worldwide challenges in the process of construction. Xiaowan Hydropower Project is a landmark project implemented by the state in implementing the strategy of developing the western region and the strategy of “sending electricity from west to east” and is the leading power station in the middle and lower reaches of the Lancang River. Xiaowan Hydropower Plant is equipped with 6 sets of single-flow capacity of 700,000 kW Francis units with a total installed capacity of 4.2 million kW, with an annual generating capacity of 19 billion kW · h and a total storage capacity of 15 billion m 3, mainly generating electricity Flood control,