论文部分内容阅读
济宁运河煤矿有限责任公司位于济宁市任城区南张镇境内,1995年8月1日动工兴建,1999年5月1日正式生产,矿年生产能力150万吨。运河煤矿起初由落陵煤矿开始筹建,后与山东鲁能电力集团公司合作,于1998年改组为山东济宁运河煤矿有限责任公司。 一、精心组织 建设一流现代化矿井 运河煤矿从开始筹建,在全国十佳矿长、公司董事长兼总经理王彦伦同志的带领下,始终贯穿了“高、严、精”三字方针。高即高起点、高标准、高速度。运河煤矿以“技术先进、管理科学、装备配套、安全可靠、经济效益好的一流现代化矿井”为目标,通过优化设计,使矿井生产能力由60万吨提高到150万吨;矿建周期缩短两年,建设资金节省40%。严即严要求,严管理,严考核。为了确保矿井施工及设备安装质量,矿上建立了严格的工程质量及设备安装质量验收标准与监管机制,达不到要求的坚决返工,其中重大项
Jining Canal Coal Mine Co., Ltd. is located in Nanzhang Town, Rencheng District, Jining City. The construction started on August 1, 1995 and was formally produced on May 1, 1999. The annual production capacity of the mine is 1.5 million tons. The canal coal mine was initially built by the Luoling Coal Mine and later cooperated with Shandong Luneng Power Group Corporation. In 1998, it was reorganized into Shandong Jining Canal Coal Mine Co., Ltd. I. Elaborate organization Building a first-class modern mine The canal coal mine has been under construction since its inception. Under the leadership of Comrade Wang Yanlun, chairman and general manager of the National Top Ten Mine Leader, the company has consistently adopted the three-character principle of “high, strict and refined”. High is a high starting point, high standards, and high speed. The canal coal mine aims at a first-class modern mine with advanced technology, management science, equipment support, safety and reliability, and good economic returns. Through optimized design, the mine production capacity will be increased from 600,000 tons to 1.5 million tons; the construction period will be shortened by two. In 2005, construction funds will save 40%. Strictly strict requirements, strict management, strict assessment. In order to ensure the quality of mine construction and equipment installation, the mine has established a strict engineering quality and equipment installation quality acceptance standards and regulatory mechanisms, and can not meet the requirements of resolute rework, including major items