论文部分内容阅读
根据水利电力部(85)水电计字第80号文件精神及省水利厅,关于调查研究水利工程投资实行“拨改贷”有关问题的调查提纲,我站组织了有关方面的技术力量,对我站工程投资贷款的偿还能力,作了有关方面的调查研究工作。现将调查研究结果,报告如下: 小樊电灌站工程,于1958年兴建。后经三次较大的改建扩建,目前渠首枢纽包括两级四站,设计抽水能力为6立方米/秒,总扬程66.8~70.8米。总装机8470瓩。在正常情况下,
According to the spirit of the Ministry of Water Resources and Electric Power (85) No.80 Hydroelectric No.80 Document and the Provincial Department of Water Resources, on the survey outline of issues related to investigating and researching the implementation of water conservancy projects, we have organized the technical force of relevant parties to me. The repayment ability of station engineering investment loans was investigated and researched by relevant parties. The investigation and research results will now be reported. The report is as follows: The Xiaofan electric irrigation station project was built in 1958. After three major renovations and expansions, the heading canal now includes two stages and four stations. The designed pumping capacity is 6 cubic meters per second and the total head is 66.8 to 70.8 meters. The total installed capacity is 8470瓩. under normal circumstances,