论文部分内容阅读
为适应电能替代的时代需求,研究新的电能替代形式,促进甘肃省新能源电力的消纳,首次对甘肃省陆电登机替代方案进行设计,并在此基础上对甘肃省主要机场的陆电登机替代空间进行测算。将陆电登机的桥载设备运行成本与传统飞机APU运行成本进行对比分析。并就其相关影响因素对2种设备运行成本差额的影响进行敏感性分析,结果表明桥载设备相比于传统飞机APU具有明显的经济性。
In order to meet the needs of the era of substituting for electricity, a new alternative form of electric energy was studied to promote the consumption of new energy in Gansu Province. For the first time, an alternative design of the land-based boarding in Gansu Province was designed. On the basis of this, Electric boarding alternative space calculations. Comparing the operating cost of Ludian boarding equipment with the operating cost of the traditional aircraft APU. The sensitivity analysis on the impact of related factors on the operating cost difference between the two equipments shows that the bridge-mounted equipment has obvious economy compared with the traditional aircraft APU.