我台发射机房始建于1986年,从发射机房的整体布局、工作环境、供电配置、整体维护与管理,都存在着一些不合理的因素。二层楼近600m~2工作空间存在着机器安放分散,工作人员过多,不能够做到科学地利用工作空间,合理地配置人员,造成空间和人员的浪费,给维护和管理带来了一定的困难。因此我们决定改造机房。
Our transmitter room was built in 1986, there are some unreasonable factors from the overall layout of the transmitter room, working environment, power supply configuration, the overall maintenance and management. The second floor of nearly 600m ~ 2 working space exists scattered decentralization of the machine, too many staff, can not be scientifically using the work space, a reasonable allocation of personnel, resulting in the waste of space and personnel, to bring some maintenance and management Difficulties. So we decided to remodel the engine room.