论文部分内容阅读
本文提出了时延驱动布图规划(TimingDrivenFloorplanning)的思想。在用改进的广义力矢量法优化功能单元间连线时延的同时,运用非线性规划的方法进一步优化关键路径上功能单元的时延及连线时延,结果表明,这是一种有效的优化版图时延的方法。
This paper presents the idea of TimingDrivenFloorplanning. While using the improved generalized force vector method to optimize the connection delay between functional units, the non-linear programming method is used to further optimize the delay and connection delay of functional units on the critical path. The results show that this is an effective Method to optimize layout delay.