探讨了萍乡安源钢铁有限公司120万吨钢技改1080m3高炉汽动鼓风机站项目化学补给水处理系统中一级除盐系统存在的问题,提出了改进完善的方法和措施,对除盐水处理系统完善有着借鉴意义。
This paper discusses the problems existing in the primary desalination system of the chemical makeup water treatment system in the project of 1200MW steel blast furnace station of Pingxiang Anyuan Iron & Steel Co., Ltd. With a capacity of 1.2 million tons of steel. The methods and measures for improving and perfecting the desalination water treatment system Perfect for reference.