1.故障情况及检测 石家庄钢铁厂30t电弧炉是采用全液压控制的,主要控制元件为二通插装阀。1985年7月投产以后,设备运行良好,但在1988年5年1日至3日,炉前设备员反映:在冶炼过程中,炉体向出钢方向自行倾翻。经过详细观察后确认:该故障系炉体倾动缸微微上漂所致,经测定,其上漂速度为v=11cm/h。 炉体倾动的液压传动原理见图1,其动作见表1。
1. Fault conditions and testing Shijiazhuang Iron and Steel Plant 30t electric arc furnace is fully hydraulic control, the main control components for the two-way cartridge valve. After commissioning in July 1985, the equipment is in good working order. However, from January 1 to March 3, 1988, the equipment clerks in the furnace said: During the smelting process, the furnace body tilted towards the tapping direction itself. After a detailed observation confirmed that: the failure of the Department of furnace tilting cylinder slightly drift caused by the determination of its drift speed v = 11cm / h. Furnace tilting hydraulic transmission principle shown in Figure 1, the action in Table 1.