论文部分内容阅读
随着系统的扩大 ,系统备用容量的增加和电站管理模式的改变 ,电站的主接线有可能进一步简化。此文叙述了天生桥一级水电站主接线的简化及简化后所得到的效益。
With the expansion of the system, the increase of system spare capacity and the change of power station management mode, the main wiring of the power station may be further simplified. This article describes the simplification and simplification of the main wiring of the Tianshengqiao-1 hydropower station.