2011年沈阳市沈河区儿童预防接种信息监测系统评价

来源 :预防医学论坛 | 被引量 : 0次 | 上传用户:daihongjun2
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
[目的]了解沈阳市沈河区儿童预防接种信息系统录入质量,为今后改进工作提供科学依据。[方法]对沈阳市沈河区儿童预防接种信息管理平台2011年接种上传的儿童个案数据资料进行分析,并对18家接种门诊上传的2011年出生儿童个案信息进行抽查。[结果]合计调查18家接种单位,数据上传率为100.00%;上传信息成功率为100.00%。调查180名儿童,建卡及时率为88.33%;儿童预防接种卡与平台数据库中的个案儿童接种记录完全匹配的占85.00%,接种剂次记录完全匹配的占99.02%,七苗符合率为85.56%。预防接种卡与数据库中接种记录不匹配的原因为电脑未及时录入、接种日期不匹配、电脑有接种信息未及时上预防接种卡。[结论]沈河区儿童预防接种信息系统录入质量还存在一些问题,今后加强相关内容培训。 [Objective] To understand the quality of entry of children’s vaccination information system in Shenhe District of Shenyang City and provide scientific basis for future improvement. [Methods] The data of children in Shenyang vaccinated information management platform for vaccination in Shenyang in 2011 were analyzed, and the case information of the children born in 2011 inoculated by outpatients in 18 inoculated clinics was spot-checked. [Results] A total of 18 vaccination units were investigated, the data upload rate was 100.00%; the success rate of upload information was 100.00%. Investigation of 180 children, card construction and timely rate was 88.33%; children’s vaccination card and platform database case records of children vaccinated exactly 85.00%, 99.02% of inoculation records completely match, seven seedlings coincidence rate of 85.56 %. Vaccination card inoculated with the record in the database does not match the reason for the computer is not timely input, vaccination date does not match the computer vaccination information is not timely vaccination card. [Conclusion] There are still some problems in the quality of vaccination information system for children vaccinated in Shenhe District, and the related content training will be strengthened in the future.
其他文献
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
本文报导北方寒冷地区用微型颗粒饲料在 5 6亩的池塘中主养鳙鱼种 ,经 131d的饲养 ,共产鱼种 2 4 33kg ,平均亩产 4 34 5kg ,其中鳙鱼亩产 30 5kg ,占总产量的 70 2 % ,平
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊