Activation characteristics analysis on concealed fault in the excavating coal roadway based on micro

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:cdy516
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In order to effectively monitor the concealed fault activation process in excavation activities, based on the actual condition of a working face containing faults with high outburst danger in Xin Zhuangzi mine in Huainan, China, we carried out all-side tracking and monitoring on the fault activation process and development trend in excavation activities by establishing a microseismic monitoring system. The results show that excavation activities have a rather great influence on the fault activation. With the working face approaching the fault, the fault activation builds up and the outburst danger increases; when the excavation activities finishes, the fault activation tends to be stable. The number of microseismic events are corresponding to the intensity of fault activation, and the distribution rules of microseismic events can effectively determine the fault occurrence in the mine. Microseismic monitoring technique is accurate in terms of detecting geologic tectonic activities, such as fault activations lying ahead during excavation activities. By utilizing this technique, we can determine outburst danger in excavation activities in time and accordingly take effective countermeasures to prevent and reduce the occurrence of outburst accidents. In order to effectively monitor the concealed fault activation process in excavation activities, based on the actual condition of a working face containing faults with high outburst danger in Xin Zhuangzi mine in Huainan, China, we carried out all-side tracking and monitoring on the fault activation process and development trend in excavation activities system by establishing a microseismic monitoring system. The results show that excavation activities by a rather great on the fault activation. With the working face approaching the fault, the fault activation builds up and the outburst danger increases; when the excavation activities finishes, the fault activation tends to be stable. The number of microseismic events are corresponding to the intensity of fault activation, and the distribution rules of microseismic events can have locate the fault occurrence in the mine. in terms of detecting geologic tectonic activities, such as fault activations lying ahead during excavation activities. By utilizing this technique, we can determine outbreak of danger in excavation activities in time and accordingly take countermeasures to prevent and reduce the occurrence of outburst accidents.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
In this study,discrete element method(DEM) was employed to simulate the movement of non-cohesive mono-dispersed particles in a V-blender along with particle-par
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
香鱼是日本具有代表性的淡水鱼,在初夏时期被称为“旬”。在日本关东地区,每年要到六月份才允许垂钓,所以显得特别珍贵。美国一位著名鱼类专家称香鱼是“世界淡水鱼的女王”,
期刊
石油资源是促进我国经济和工业发展的关键能源,因此石油产业的规模和数量都有了很大发展.石油工程成为石油勘探和开发的基础.但是石油工程本身是一项比较复杂的项目,工程实行
本文简要介绍了情感态度在英语教学中的必要性和基本前提,并结合教学实践,提出了在中学英语作文教学中渗透情感教学的一些具体方法。 This article briefly introduces the
目的 探讨胃癌术后患者早期肠内营养的护理经验。方法 回顾性分析35例胃癌术后患者肠内营养治疗的护理资料。结果 35例均完成肠内营养支持,无严重并发症发生,降低了病死率。结论 胃癌术后早期肠内营养支持配合有效的护理措施,促进了肠功能的恢复,降低费用,缩短恢复时间,降低了术后并发症,提高了治疗效果,对患者的早日康复有重要意义。
该工程是其所在地区的标志性建筑。南京稼禾充分理解和把握了业主的要求,糅合自身的理解给予本工程以“体现现代智能、弘扬企业文化”的理念。故本工程在施工中运用了价格合
目的:观察和对比对消化性溃疡所致上消化道出血患者分别采用质子泵抑制剂妥洛克与洛赛克进行治疗的临床效果和不良反应发生情况。方法:本组收集我院2013年7月~2015年6月间接诊的
目的:观察老年性冠心病合并高脂血症行阿托伐他汀钙治疗的效果观察。方法:资料回顾性分析本院特定时间收治的老年性冠心病合并高脂血症患者共86例,时间段选取2014年6月~2015年6月