七流中间包结构优化的物理模拟

来源 :中国冶金 | 被引量 : 0次 | 上传用户:bhfoot
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
采用物理模拟的方法对某厂七流中间包进行了结构优化。研究结果表明,无控流装置中间包各流流动特性一致性很差,原型控流装置起到了一定的导流作用,但1流、2流与3流、4流差异较大,死区比例为22.68%;优化后的控流装置可减小各流之间的差异,延长平均停留时间到520.2s,减小死区比例至16.75%,有利于生产顺行和铸坯质量的提高。 The physical simulation method was used to optimize the structure of a factory’s seven-flow tundish. The results show that the flow characteristics of each flow in the tundish without flow control device are very poor, and the flow control device of the prototype plays a certain role in the flow diversion. However, the flow rates of flow 1, flow 2, flow 3 and flow 4 are quite different, 22.68%. The optimized flow control device can reduce the difference between each flow, extend the average residence time to 520.2s, and reduce the dead zone ratio to 16.75%, which is beneficial to the improvement of the production quality and slab quality.
其他文献
期刊
期刊
#
期刊
今年上半年全球成交新船约4803万载重吨,和2012年极度低谷相比,同比增长75%,已经接近2012年全年成交水平。当然市场这种复苏性反弹得益于诸多因素,世界经济企稳、船舶订造性价比
期刊
通过对锚网带索支护与U-29型钢支护巷道的支护效果对比及矿压观测数据的分析,找到了适应高应力复合顶板突出煤层的支护形式,取得了显著的经济效益和社会效益.
#
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
一、专业历史及现状景德镇陶瓷大学陶瓷美术学院雕塑专业成立于本校创办之初的1958年,至今已有59年的专业教学历史。自专业创建以来,它一直是本校教学建设、发展的重点专业。