论文部分内容阅读
苏联卡姆水电站的設計第一次考虑了如何用屋外式起重机对机组进行安裝、維护和檢修。机組的布置和构造完全結合水电站的布置条件和运行条件(图1)。
For the first time, the design of the Soviet Union Kamm Hydropower Station considered how to use the outdoor crane to install, maintain and overhaul the unit. The layout and construction of the unit completely combined with the layout conditions and operating conditions of the hydropower station (Figure 1).