论文部分内容阅读
为重点解决房屋建筑工程的防水质量通病,组织技术攻关,制定措施,总结交流防治渗漏经验,建设部决定在部质量、品种、效益年活动领导小组下设立一个“防水工程工作小组”。小组的主要任务是把有关部门、有关专业力量组织起来,制订有关政策、法规和措施;开展调查研究,摸清渗漏情况和材质情况:组织技术攻关,解决设计、施工及使用中的一些质量通病;总结经验,组织交流,推广成熟的新技术、新工艺、新材料,力争在3年内明显改善我国房屋建筑工程的屋面、墙面、地下室、厨房、卫生间的渗漏现象。建设部防水工程工作小组由12人组成,建设部总工程师许溶烈任组长,部科技委委员何健安、林
In order to focus on solving the problem of water quality defects in house construction projects, organizing technical breakthroughs, formulating measures, and summarizing exchange experience in preventing and controlling leakage, the Ministry of Construction decided to set up a “Waterproof Engineering Working Group” under the Leading Group for Departmental Quality, Variety, and Benefit Activities. The main task of the group is to organize related departments and related professional forces to formulate relevant policies, regulations and measures; to conduct investigations and studies to find out leakage and material conditions: to organize technological research and solve some of the quality problems in design, construction and use. Common problems; Summarize experience, organize exchanges, promote mature new technologies, new processes, and new materials, and strive to significantly improve the leakage of roofs, walls, basements, kitchens, and toilets of China’s housing construction projects within three years. The Waterproofing Working Group of the Ministry of Construction consists of 12 members. Xu Ronglie, Chief Engineer of the Ministry of Construction, is the head of the Ministry of Science and Technology. He Jianan and Lin