论文部分内容阅读
本文从丹江口水利枢纽初期工程运行实践所取得的巨大的发电效益(包括电量、容量效益),总结了动能规划和运行调度诸问题,指出规划设计中所选取的兴利水位、装机规模、供电范围及运行方式是合理及经济的;并提出了控制供水期水位消落、减少汛期调峰弃水及提高电站运转效率等措施以进一步扩大该枢纽的发电效益。
This paper summarizes the problems of kinetic energy planning and operation scheduling from the huge power generation benefits (including power and capacity benefits) obtained from the initial engineering operation of Danjiangkou hydro-junction and points out the factors such as the water level, installed capacity, power supply range And the mode of operation is reasonable and economical. Measures such as controlling the water level drop during the water supply period, reducing the peak water and reducing the flood during the flood season, and improving the operation efficiency of the power station are also proposed to further expand the power generation efficiency of the hub.