论文部分内容阅读
阐述了地铁建设过程中的系统设备总联调的意义与作用,提出了总联调实施过程中的具体步骤、对接口资源分析、综合试验中各子系统的对应关系、计算机集成环境、仿真技术应用等问题的解决方案,并以设备总联调在广深准高速铁路工程中的实践为例对所提出的问题进行了说明。
The meaning and function of system equipment joint adjustment in subway construction process are expounded. The concrete steps in the process of total joint adjustment are put forward. The interface resource analysis, the corresponding relationship of each subsystem in the integrated test, the computer integrated environment, the simulation technology Application and other issues of solutions, and equipment to the main joint transfer in the Guangzhou-Shenzhen-Zhungen high-speed railway project as an example of the issues raised.