本文采用改进挣得值法与阜新太阳广场项目相结合的方法,在查阅大量的国内外相关文献的基础上,分析造价动态分析与控制的理论方法,对阜新太阳广场项目的施工阶段建立挣得值模型,并对项目的进度、成本和质量进行预测分析,及时找出项目施工中实际与预测的偏差,包括进度、成本以及质量偏差。本文从进度、成本、质量三方面提出具体的控制措施,以最终实现对建筑项目施工阶段造价的有效控制。
Based on a large number of domestic and foreign literatures, this paper analyzes the theory and method of dynamic analysis and control of cost, and builds up the construction phase of Fuxin Solar Plaza project Value model, and predict the progress, cost and quality of the project, find out the actual and forecast deviations in project construction in time, including the progress, cost and quality deviation. This article puts forward specific control measures from the aspects of progress, cost and quality so as to realize the effective control of the construction cost of the construction project finally.