(一) 一般情况12240Z柴油机连杆采用主副连杆结构,该机装在北京型内燃机车上。北京型机车投入运用已经多年,柴油机主、副连杆部件都未发生重大事故,基本满足运转要求。但自1981年起天津、石家庄及郑州等机务段都曾出现副连杆断裂事故。初步统计,从1981年4月起至1983年7月止,已有15台机车因连杆断裂而造成机体破损、气门顶弯及缸套击破等重大事故,影
(A) the general situation 12240Z diesel connecting rod with main and auxiliary link structure, the machine installed in Beijing diesel locomotive. Beijing-type locomotive has been put into operation for many years, diesel main and auxiliary link components have not been a major accident, the basic operation to meet the requirements. But since 1981, Tianjin, Shijiazhuang and Zhengzhou and other locomotive depot have appeared on the fracture accident. Preliminary statistics show that from April 1981 to July 1983, there have been 15 locomotives broken due to connecting rods, causing body damage, valve bending and cylinder liner breaking and other major accidents.