沪宁高速公路扩建工程采用“两侧拼接加宽为主、局部分离加宽”的方法,将全线主线由原双向四车道扩建为双向8车道,加宽后8车道整体路基宽42.5m,桥梁宽41.5m。桥梁的拼接模式采用两侧加宽,同结构、同类型、同跨径、上部构造连接,下部构造不连的方法予以拼接。对于上部构造采用板式结构的桥梁,由于新老结构的拼接需拆除原桥外侧边板25cm的悬臂,大量凿除工作会造成施工工期过长,影响沪宁高速公路扩建时期的通行能力,设计考虑切割原桥外侧边板的悬臂,采用植筋技术将新老结构连接。
Shanghai-Nanjing Expressway expansion project using “widening of the main splicing on both sides, partial separation widened ” approach, the main line from the original two-way four-lane expansion of the two-way eight lanes, widening eight lanes of the overall width of 42.5m , The bridge is 41.5m wide. Bridge splicing mode with widening on both sides, with the structure, the same type, with the span, the upper structure of the connection, the lower part of the structure is not connected to splicing. For the upper structure of the bridge with a plate structure, due to the new and old structure splicing need to dismantle 25cm cantilever outer edge of the original bridge, a large number of chiseling will result in the construction period is too long, affecting the capacity of Shanghai-Nanjing Expressway expansion of the capacity design, design Consider the cantilever cutting the outer edge of the original bridge, the use of planting technology to connect the old and new structures.